Data Centre cabling from Poyle to the Laleham Sub-Station

There is absolutely nothing that’s good about this proposal; it will inevitably lead to an application for a data centre and whilst, this would be located at Poyle and not on Spelthorne or Surrey soil, it will draw on our services including water from our local water sources and use our electricity grid via the sub-station at Laleham.

In the meantime, local residents will have to endure yet more roadworks and traffic disruption from the section of works located in Spelthorne that are required to connect the high voltage cabling, above and below ground on the route, from Poyle to the Laleham sub-station. We respectfully ask you also to bear in mind that we have very recently endured more than our fair share of the “fall out” from recent local development and works in Spelthorne, including larger projects e.g. the development of Shepperton Studios, the Esso fuel pipeline from Southampton to Heathrow (SLP), the Cadent work to upgrade gas pipes and work for connection of newly developed tower blocks, to the general services.

At this stage, we should instead be urgently calling on the government to introduce dedicated planning rules for data centres and to provide a proper plan to guide their development; instead of using land on a “willy-nilly” basis, especially in such densely populated areas or on the much needed farmland around the UK.

The government must also be encouraged to promote innovative data-centre design, to minimise the impact of their resource usage and their immense scale and size. Building data centres in the correct way, will mean using cooling systems that do not need billions of litres of water, particularly as water is very scarce in this area.

Residents naturally fear the possibility of future data centre development because with it, comes the possibility of a gargantuan, water-guzzling industrial unit, which would adversely affect services to densely populated areas. It could also be a potential drain on electrical power and we must not forget the associated large Battery Energy Storage System (BESS) which, comes with huge potential fire risks.

Whatever a data centre proposal says, the number of local jobs envisioned, to install the cabling & the subsequent building of a data centre, may appear tantalising will be very short-term; once a data centre is up and running, there is a minimal requirement for personnel.

For these reasons the Staines Town Society does not support the proposal to install high voltage electrical and communications cabling above and below ground, between Poyle and the Laleham sub-station.